β All accessories are priced at AUD 5.99 per meter π¦ SERIES π§ NAME π MATERIAL π LENGTH (mm) π¨ COLOR π¦ PAG (PCS) 1OUTSIDE CORNER OUTSIDE CORNER STEEL 3000 SAME COLOR 16 OUTSIDE CORNER BASE ALUMINUM 3000 SILVER 8 EXTERIOR CORNER CAP STEEL 3000 SAME COLOR 40 OUTSIDE CORNER STEEL 3000 SAME COLOR 4 2CONNECTING BAR CONNECTING BAR STEEL 3000 SAME COLOR 30 CONNECTING BAR BASE ALUMINUM 3000 SILVER 60 3J-CHANNEL J-CHANNEL STEEL 3000 SAME COLOR 16 4INSIDE CORNER INSIDE CORNER STEEL 3000 SAME COLOR 16 INSIDE CORNER STEEL 3000 SAME COLOR 60 INSIDE CORNER STEEL 3000 SAME COLOR 10 5WINDOW & DOOR WINDOW & DOOR J-CHANNEL STEEL 3000 SAME COLOR 16 WINDOW & DOOR CORNER COVER STEEL 70 Γ 70 SAME COLOR / WINDOW SLEEVE / WINDOW FRAME STEEL 3000 BLACK / WHITE 10 6OTHER BOTTOM FLASHING STEEL CUSTOMIZE BROWN 20 STARTER STRIP ALUMINUM 3000 SILVER 60 π οΈ How to Install Thermal Metal Siding Panels with Decorative Finishes π Table of Contents π§° Tools and Materials Needed 1οΈβ£ π¨ Prepare the Wall Surface 2οΈβ£ βοΈ Panel Layout and Cutting 3οΈβ£ π Installing the First Panel 4οΈβ£ π§ Interlocking Subsequent Panels 5οΈβ£ π Corner Treatment and Trims 6οΈβ£ π‘οΈ Sealing and Thermal Performance 7οΈβ£ βοΈ Final Inspection β Advantages π’ Common Applications π§° Tools and Materials Needed Measuring tape and chalk line Spirit level and plumb line Circular saw with metal/PU cutting blade or hand shears Screw gun or drill driver Self-tapping screws with sealing washers Starter strips and corner trims (metal profiles) Sealant tape or PU foam (optional) Safety gear (gloves, goggles, helmet) .step-badge { width:36px; height:36px; line-height:36px; background:#0b3c6e; color:#fff; text-align:center; border-radius:50%; font-weight:bold; display:inline-block; margin-right:10px; font-size:18px; } .step-title { font-size:22px; color:#0b3c6e; font-weight:bold; margin-top:20px; margin-bottom:12px; } 1 π¨ Prepare the Wall Surface Check wall flatness and ensure the substrate is level. Install vertical battens or steel furring strips as needed (400β600 mm spacing). Install a perfectly level starter strip at the bottom to align the first row of panels. 2 βοΈ Panel Layout and Cutting Measure wall dimensions to determine panel quantities and necessary cuts. Cut panels using a circular saw with a fine-tooth metal/PU blade. Avoid angle grinders. Always cut panels from the backside to protect the decorative surface. 3 π Installing the First Panel Place the female edge of the first panel onto the starter strip. Ensure the panel is vertically plumb and aligned. Fix using self-tapping screws with sealing washers. Do not overtighten screws to avoid panel distortion. 4 π§ Interlocking Subsequent Panels Insert the female joint of the new panel into the male groove of the installed panel. Gently tap with a rubber mallet if necessary. Fix each panel to the substructure at recommended intervals (600β800 mm). Progress across the wall from bottom to top and corner to corner. 5 π Corner Treatment and Trims Outside corners: Use pre-fabricated corner trims matching panel finish. Inside corners: Use dedicated inside corner profiles or angle trims. Window and door openings: Install J-trims or U-profiles. Top edge: Install cap trim or flashing for waterproofing. 6 π‘οΈ Sealing and Thermal Performance (Optional) Apply sealant tape or PU foam in high wind/rain areas. Seal around window frames and penetrations properly. 7 βοΈ Final Inspection Check that all panels are securely fastened. Verify horizontal and vertical alignment. Inspect trims and flashings. Clean the panel surfaces of dust and debris. β Advantages Superior insulation with 16 mm PU core Decorative options: brick, stone, wood imitation Durable 0.25 mm Alu-zinc coated steel Fast interlocking installation Low maintenance finish π’ Common Applications Residential homes Commercial buildings (showrooms, retail) Industrial warehouses and prefabricated offices Renovation projects requiring insulation + decorative finish