Marco Beverage Installation for the FRIIA, POUR'D, and Jet6.WHAT’S INCLUDED: Travel (within territory) and labor required to install the equipment Installation & setup of the equipment Installation to be performed during normal business hours Monday-Friday local time Taxes, fees, etc. Installation must be within 6 months of receipt WHAT'S NOT INCLUDED: Additional travel costs for out of network service Water filtration systems Additional installation materials (ex. plumbing fittings, tubing, plug, outlet, etc.) Training on the equipment REQUIREMENTS:The following site conditions must be met at the time of installation. Failure to have any of the following items ready prior to installation may result in forfeiture of installation services at a 20% penalty. For the Jet6 and POUR'D, coffee must be on hand prior to installation. Countertop holes must be cut per manufacturer specifications prior to installation Plumbing, drain, and electrical must be in placed and complete per manufacturer's installation specs prior to installation PLEASE NOTE: This installation package does not include general construction services (including but not limited to electrical wiring, water and drain plumbing, drilling countertops, the installation of other equipment, etc.)