Ropeye Loops are good for deck attachments where loading angles are close to 90 degrees. They can also be used as stick-on attachments. Ropeye TDP (Through-Deck Pushing) and SLR (Self-Locking Ring) are required for correct installation but sold separately. Loop 4 – Rope 4mm / Pad 50mm / TDP 14 Loop 5 – Rope 5mm / Pad 50mm / TDP 16 Loop DatasheetInstallation Drill the installation hole the right size Loops must always be used with a TDP SLR Usage is recommended to avoid premature wear of Regularly examine the loop for signs of damage Damaged loops are unsafe and must be replaced Do not exceed safe working load Product sheetROPEYE LOOP Ropeye Single Braid and Double Braid Loops are scientifically and practically tested and proven. These products provide stable quality and maximum durability for heavy loads. 20 OO0+20ORopeye Loop is designed for vertical loads with maximum loading angle of 20 degrees.Rope mmLoop mmPad mm FAQs Any guidance on drilling the installation hole?Drill the installation hole the correct size. How should I prepare the surface before installing?Clean the installation area with acetone before installation. What inspection/maintenance is recommended?Regularly examine the loop for signs of damage. How long should I wait before putting load on it after install?Wait 24 hours before putting any load on the product. What warranty is stated for Ropeye products?Ropeye products have a 2 year warranty. What load direction is the Ropeye Loop designed for?It is designed for vertical loads. Who do I contact for help with installation, servicing or advice?Contact the SailRACE team — as certified marine experts we're happy to help with product selection, installation and after-sales servicing, before and after your purchase. {"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "Any guidance on drilling the installation hole?", "acceptedAnswer": {"@type": "Answer", "text": "Drill the installation hole the correct size."}}, {"@type": "Question", "name": "How should I prepare the surface before installing?", "acceptedAnswer": {"@type": "Answer", "text": "Clean the installation area with acetone before installation."}}, {"@type": "Question", "name": "What inspection/maintenance is recommended?", "acceptedAnswer": {"@type": "Answer", "text": "Regularly examine the loop for signs of damage."}}, {"@type": "Question", "name": "How long should I wait before putting load on it after install?", "acceptedAnswer": {"@type": "Answer", "text": "Wait 24 hours before putting any load on the product."}}, {"@type": "Question", "name": "What warranty is stated for Ropeye products?", "acceptedAnswer": {"@type": "Answer", "text": "Ropeye products have a 2 year warranty."}}, {"@type": "Question", "name": "What load direction is the Ropeye Loop designed for?", "acceptedAnswer": {"@type": "Answer", "text": "It is designed for vertical loads."}}, {"@type": "Question", "name": "Who do I contact for help with installation, servicing or advice?", "acceptedAnswer": {"@type": "Answer", "text": "Contact the SailRACE team — as certified marine experts we're happy to help with product selection, installation and after-sales servicing, before and after your purchase."}}]}