✦ Verified product
83-07: Preplanning for Cooling Tower Upgrading
USD 20.00
Title
CTI Marketplace
Verified independent store
→
Before proceeding with a thermal upgrade project determine the present, or like new, thermal operating level of the tower relative to the original design conditions. Then, with an